Mon–Sat: 8:00 AM–8:00 PM GMT+8 OEM / ODM Custom Interconnect Solutions
CTP Engineering Resource Center

Magnetic Connector & Cable Engineering Guides

Use this engineering resource center to select the correct magnetic connector, magnetic cable assembly or pogo pin product path. Compare contact counts, power and signal requirements, high-current conditions, industrial environments and wearable charging applications before submitting a custom project.

Magnetic Cable Guides

Define the Complete Magnetic Cable Assembly

Use these guides when the supplied product must include the magnetic connector, cable conductors, cable length, termination and mechanical protection.

Main Cable Guide

Magnetic Pogo Pin Cable Selection Guide

Compare connector components and finished cable assemblies, then define cable length, conductor and termination.

Use when: The overall cable supply scope has not been finalized.
Open Main Cable Guide →
Power Path

1–2 Pin Magnetic Power Cable Guide

Review complete supply and return paths, polarity, cable length and voltage-drop considerations.

Use when: The cable primarily provides a simple power connection.
Review Power Cable Design →
Wire Mapping

3 Pin vs 4 Pin Magnetic Cable Guide

Define auxiliary contacts, signal requirements, source-side wiring and device-side contact mapping.

Use when: Power must be combined with additional electrical channels.
Compare 3 Pin and 4 Pin →
Electrical Performance

High-Current Magnetic Cable Solution

Define current profile, total loop resistance, voltage drop, contact allocation and temperature validation.

Use when: Current capacity, thermal performance or power loss is critical.
Review High-Current Design →
Industrial Application

Industrial Magnetic Cable Application Guide

Review installation zones, movement, vibration, contamination, strain relief and maintenance access.

Use when: The cable is integrated into machinery or industrial equipment.
Review Industrial Conditions →
Wearable Application

Smart Wearable Charging Application Guide

Review interface placement, compact packaging, docking behavior, sweat exposure and breakaway requirements.

Use when: The charging interface is integrated into a body-worn device.
Review Wearable Integration →
Before Opening a Guide

Prepare Four Types of Project Information

The guide can provide a more accurate product route when the electrical, mechanical, cable and operating conditions are defined together.

01

Electrical Functions

List voltage, current, power, return, signal, control, detection and identification paths.

02

Mechanical Space

Provide available length, width, height, PCB area, mating direction and device geometry.

03

Cable Requirements

Define cable length, outlet direction, conductor needs, movement and opposite-end termination.

04

Project Conditions

Provide the application, environment, validation requirements, quantity and available drawings.

Product appearance or pin count alone is not enough to complete a connector or cable selection. Use the guides to organize the project requirements before requesting a final drawing.
Engineering Guide FAQ

Questions About Using the CTP Engineering Guides

Should I start with Magnetic Connector or Magnetic Cable?
Start with Magnetic Connector when the required supply is the magnetic mating component. Start with Magnetic Cable when CTP must also supply cable length, conductors, mechanical protection and an opposite-end termination.
Which guide should I use when the pin count is uncertain?
Begin with the Magnetic Connector Selection Guide. List every independent power, return, signal, control and detection path before selecting a pin-count category.
Do the engineering guides replace product specifications?
No. The guides help define the project route and information required for selection. Product-specific dimensions, electrical values and validation conditions should be confirmed on the relevant product page or project drawing.
When should I use the High-Current guide?
Use it when continuous current, peak current, voltage drop, loop resistance, power loss, contact allocation or temperature rise requires review.
What is the difference between Industrial and Wearable guides?
The Industrial guide focuses on machinery installation, cable movement, vibration, contamination and maintenance. The Wearable guide focuses on compact packaging, charging behavior, body-worn exposure and user docking.
What should I submit for a custom project review?
Provide the application, electrical functions, voltage and current, available space, mating direction, cable requirements, operating environment, expected quantity and available 2D or 3D drawings.
Custom Project Review

Have the Requirements but Not the Final Product?

Submit the electrical functions, installation space, cable requirements, operating conditions and available drawings. The project can then be routed to the appropriate magnetic connector, magnetic cable or pogo pin solution.

Submit Project Requirements