CTP ENGINEERING EVIDENCE
Evidence for magnetic connector and cable projects
A factual review point for OEM/ODM buyers: current English management-system certificates, in-house test-equipment photographs, exhibition records, drawing resources and the project-confirmation steps used before a specification becomes a production commitment.
EXHIBITION RECORD
CTP at electronica Shanghai 2026
CTP presented magnetic connectors and magnetic cable assemblies at booth W4.578, Shanghai New International Expo Centre, July 1–3, 2026. The images below are faithful web-optimized versions of the original company photographs.





CURRENT ENGLISH CERTIFICATES
Management-system certificates available for buyer review
The certificate images below are issuer-provided English pages for Shenzhen Yongtan Electronics Co., Ltd. Their stated scope is the production and sales of electronic connectors. Certificate status and dates are shown exactly as stated on the documents.
ISO 9001:2015
Certificate No. 24CN34506284Q
Issuer: ACM International Certification Limited
Issued: May 29, 2024
Expires: June 10, 2027
ISO 14001:2015
Certificate No. 24CN34506285E
Issuer: ACM International Certification Limited
Issued: May 29, 2024
Expires: August 24, 2027
ISO 45001:2018
Certificate No. 24CN34506286S
Issuer: ACM International Certification Limited
Issued: May 29, 2024
Expires: August 24, 2027
Additional English conformity document
The available TÜV Rheinland LVD document is dated July 12, 2024 and identifies registration No. AN 50637423 0001 and report No. CN248CLR 001 for a cable assembly for conductive charging of electric vehicles. The page supplied to this library is page 1 of 2 and does not state an expiry date, so it is presented as a document record rather than a blanket product claim.
IN-HOUSE TEST EQUIPMENT
Photographed equipment for connector and cable validation
These are existing CTP laboratory and test-area photographs. They establish equipment presence and test context. Project-specific methods, range, accuracy, fixture, calibration status and pass/fail criteria are confirmed in the applicable validation plan or test record.






BEFORE SAMPLING
What CTP confirms with your engineering team
Function allocation
Power, signal and grounding requirements are mapped to the proposed pin layout.
Mechanical interface
Working stroke, alignment, mounting, cable exit and retention requirements are reviewed.
Project conditions
Application environment, mating behavior and validation expectations are recorded.
Controlled release
The approved drawing and agreed validation plan control the final sample or production release.
AVAILABLE NOW
Evidence already available for project review
Product catalogs
Browse the complete magnetic connector and magnetic cable catalogs without changing the established product URLs.
Engineering drawings
Use the download center to review available connector drawing resources before requesting a customized revision.
Engineering guides
Review design, testing and sourcing considerations for magnetic connectors, data cables and charging cables.